Packed up the cylinders to ship them out for a proper rebore. Got them taken apart, boxed in their own tiny boxes, placed in an old thick plastic cooler for the best protection (not pictured), then that placed in its own box. Ready to ship!
Most of the Suzuki is all set, and the sidecar is mounted again. The sidecar had a full rewiring, the the bike was gone through entirely repainted, and we made our own exhaust for it.
Bike runs great, and with the added weights on the sidecar frame it handle super well. Bunch of pics below!